Core Insights - The successful launch of the first high-altitude wind power unit by CRRC in Delingha, Qinghai, marks a significant milestone in the establishment of China's largest and most comprehensive "wind-solar-storage-hydrogen" integrated industrial base in the western region [1][2] - CRRC aims to leverage its dual advantages in rail transit and clean energy equipment to promote the integration of technology and industry with the regional energy advantages of Qinghai [2] Group 1 - The newly launched wind power unit and energy storage system are specifically designed for high-altitude environments, ensuring safe and efficient operation under harsh conditions such as high turbulence, high radiation, strong wind and sand, low temperatures, and low pressure [1] - CRRC is one of the earliest companies in China to enter the wind power equipment manufacturing sector, possessing a complete industrial chain for wind power equipment [1] - The Delingha New Energy Equipment Manufacturing Industrial Park will include energy storage systems and wind turbine manufacturing workshops, with plans to expand into wind turbine blades, towers, and electrical equipment [2] Group 2 - The adjacent 1 million kW source-network-load-storage project includes 700,000 kW of photovoltaic power, 300,000 kW of wind power, and 200 MW/800 MWh of electrochemical energy storage, utilizing core equipment manufactured locally by CRRC [2] - CRRC has partnered with over ten local companies in Qinghai, including Trina Solar and Ganfeng Lithium, to co-sign the "Clean Energy Equipment Industry Chain Co-construction Action Plan," extending its technological and manufacturing expertise to the supply chain [2]
青海德令哈新能源装备制造迎来新进展