Core Insights - Geermu Airport is becoming a vital air logistics hub connecting the northwest frontier with the inland economic circle, driven by strategic initiatives under Qinghai's "Four Regions Construction" plan [1][6] - The airport has achieved a record cargo throughput of 379.4 tons as of May 20, marking a year-on-year increase of 118.7%, indicating strong integration into the national logistics network [1][6] Route Network Optimization and Transport Capacity Upgrade - Geermu Airport has implemented a "hub-radiation + transfer" route strategy to meet the growing transportation needs for highland specialty agricultural products and mineral resources, increasing flights to Xining to 18 per week and to Xi'an and Chengdu to 11 per week [2] - The introduction of the "Highland Express" transfer product allows for 24-hour delivery service to over 60 cities, with a record 18-hour delivery time for fresh goji berries to Shenzhen [2] - A new 3,000 square meter smart cargo terminal has been launched, enhancing cargo handling capacity to 120 tons per hour, and a drone cargo transfer center has been trialed for point-to-point transport in remote areas [2] Customized Solutions to Meet Diverse Needs - The "Highland Express Green Channel 3.0" service has been introduced for express logistics companies, reducing the full process time from cargo station to aircraft to 45 minutes, a 50% improvement over traditional methods [3] - The airport has developed a 500 cubic meter intelligent temperature-controlled warehouse for fresh produce, achieving a temperature fluctuation control within ±1°C during trials, with a quality loss rate below 0.3% [3] - The "Direct Flight from Origin" project has significantly increased the shipment volume of geographical indication products, with a year-on-year growth of 210% [3] Participation in National Logistics Hub Construction - Geermu Airport is actively involved in the construction of a national logistics hub, with plans for an "Aviation Logistics Industrial Park" that will create over 800 jobs upon completion in 2026 [4] - The airport has partnered with Qinghai Railway Company to develop an "air + rail" transport product, reducing transportation costs by 35% compared to traditional road transport [4] - Strategic cooperation agreements have been signed with major logistics companies to build a highland smart logistics platform, enabling real-time tracking of goods and reducing response time to anomalies to 15 minutes [4] Building a New High Ground for Aviation Logistics in the Qinghai-Tibet Plateau - The strategic plan for Geermu Airport aims to create an "aviation + industry + city" ecosystem, with a second-phase expansion project set to begin by the second half of 2025 [5] - The expansion includes a new 12,000 square meter international cargo terminal and plans to introduce wide-body freighters, increasing the maximum cargo capacity from 15 tons to 60 tons per flight [5] - The airport aims to develop aviation logistics finance and processing industries, targeting a cargo throughput of over 5,000 tons by 2028, positioning itself as a benchmark for the "Belt and Road" initiative [5]
青藏高原航空物流新动能 格尔木机场货邮吞吐量实现跨越式增长
Zhong Guo Min Hang Wang·2025-05-23 03:17