Workflow
北京地铁11号线二期启动环评,共设5座换乘站
Xin Jing Bao·2025-05-27 03:06

Core Points - Beijing Subway Line 11 Phase II is a significant infrastructure project that extends the existing Line 11 from Xincheng Steel Station to Lize Business District Station, covering approximately 18.3 kilometers with 14 stations [1][3][6] - The project aims to improve transportation conditions in the surrounding areas, providing fast and high-capacity public transit services [6][8] - The first environmental impact assessment (EIA) has been publicly announced, with a second EIA expected to follow, which will provide more detailed information [3][5] Project Overview - The total length of Line 11 Phase II is approximately 18.3 kilometers, with 14 stations, including 5 transfer stations [3][9] - The line will serve key areas such as Xincheng High-end Industry Service Area, Lugu Qingtai Residential Group, Beijing West Station, and Lize Financial Business District [1][6] - The construction will be entirely underground, with a vehicle depot located in the southern area of Xincheng, covering about 33.8 hectares [3][8] Technical Specifications - The technical standards for Line 11 Phase II will be consistent with those of Phase I, with a maximum design speed of 100 kilometers per hour [7] - The project has undergone multiple revisions, with changes in the total length and number of stations during the planning phases [8][9] Public Participation - During the EIA process, the public is encouraged to submit opinions related to the environmental impact assessment through various channels [4]