Core Viewpoint - The company has announced the upgrade and construction of its blast furnace equipment, specifically the replacement of existing furnaces with new ones, which will increase production capacity from 2.71 million tons to 3.08 million tons [1][2]. Group 1: Project Details - The original plan involved replacing two existing 450m³ furnaces and two 1000m³ furnaces with two 1550m³ furnaces, with a total production capacity of 2.71 million tons per year [1]. - The revised plan now includes replacing the existing furnaces with one 2290m³ furnace and one 1200m³ furnace, resulting in an increased capacity of 3.08 million tons [1][2]. - The replacement ratio has changed from 1.25:1 to 1.1:1 [2]. Group 2: Regulatory Compliance - The project has been verified and approved by the Liaoning Provincial Department of Industry and Information Technology, confirming that it meets the requirements of the "Steel Industry Capacity Replacement Implementation Management Measures" [2]. - The new 2290m³ furnace has been confirmed to align with the announced capacity replacement plan and is deemed ready for production [2].
凌钢股份: 凌源钢铁股份有限公司关于1#-4#高炉装备升级建设项目—2290m3高炉投产的公告