Group 1 - The Guangzhou Pearl River Industrial Group announced the completion of the pile foundation construction for the first phase of the Guangzhou Grain and Oil Food Industry Park, marking a transition to the main structural construction phase [2] - The project covers a total construction area of 128,300 square meters and plans to build four warehouses with a total storage capacity of approximately 511,100 tons, along with 63 silos and supporting facilities [2] - The completed project aims to introduce modern production facilities, advanced industry standards, and smart management technologies, addressing the high-standard grain storage gap in Guangzhou and setting a new benchmark for the integration of the grain supply chain in the Greater Bay Area [2] Group 2 - The project faced geological challenges such as granite boulders, soft soil layers, and sudden drops in underground rock surfaces, which were addressed using Building Information Modeling (BIM) to visualize the complex geological structure [3] - The construction team implemented a "one pile, one table" system to meticulously record pile data and conducted 24-hour supervision to enhance construction efficiency, successfully completing all pile foundation pouring within 90 days [3] - The use of advanced drilling techniques allowed for a 40% reduction in the time required for single pile formation, optimizing the construction and management processes [3]
大湾区“米袋子”重点项目建设完成桩基施工