Core Viewpoint - China Petroleum Engineering Construction Corporation (CPECC) has successfully completed the high-standard handover of the Guangxi Petrochemical Refining and Chemical Integration Project's ground flare system, marking a significant milestone in the company's operational capabilities [1][2] Group 1: Project Overview - The ground flare system is designed to handle combustible emissions during emergencies such as shutdowns, power outages, and operational failures, representing the first use of an open ground flare across all chemical facilities by China Petroleum [1] - The project was completed in 6 months, optimizing 1,275 civil construction processes and 258 windbreak wall foundations, achieving completion 15 days ahead of schedule through a two-shift work system [1] Group 2: Quality Control and Safety Measures - A rigorous quality control system was implemented using the DingTalk platform to establish an inspection database, ensuring daily data uploads and corrective instructions [1] - The project achieved 1.04 million safe working hours with a commitment to zero accidents, supported by a risk analysis meeting and energy isolation plans for hazardous operations [2]
广西石化化工地面火炬工程中交