Core Insights - T2 Metals Corp. announced results from its Q1 2025 drill program at the Sherridon VMS project, highlighting high-grade gold and silver intersections, including 7.2 g/t Au and 145.5 g/t Ag [2][4][6] Group 1: Drill Program Overview - The Q1 2025 drill program consisted of four holes totaling 1,120 meters, targeting a strike length exceeding 800 meters east of the Bob Lake Historical Resource [3] - The drilling focused on untested geophysical targets rather than areas with past mining or historical resources, aiming to reduce environmental impact [5][12] Group 2: Significant Findings - Drillhole SHN25021 intersected a new zone of high-grade precious metal mineralization, similar to previous findings at the Lost Lake prospect, indicating potential for further exploration [4][8][11] - Drillhole SHN25022 targeted hanging wall Cu-Zn mineralization adjacent to the Bob Lake Historical Mineral Resource, intersecting semi-massive sulfide mineralization [9] Group 3: Future Exploration Plans - The company plans to continue exploring the Sherridon project for Snow Lake-style gold targets, emphasizing the potential for high-grade Au-Ag mineralization [11][30] - Geophysical surveys are currently suspended due to fire-related evacuation orders, but will resume to provide additional information on high-merit targets [13]
T2 Metals Reports Results from the Third Drill Program at the Sherridon VMS Project, Manitoba Includes High Grade Gold and Silver Intersection Grading 7.2 g/t Au, and 145.5 g/t Ag