Group 1: Infrastructure Development - The successful excavation of the Tongbaiyuan No.1 Tunnel, the longest tunnel of the Yan-Yu High-speed Railway, has reached 2000 meters, with a total length exceeding 14,000 meters. The railway will reduce travel time from Xi'an to Yulin from 5 hours to 2 hours upon completion [1] - The construction of the Luo-Ruo Railway, approximately 297 kilometers long, has begun track laying, which will enhance the "road-to-rail" transport capacity in Xinjiang by connecting with the Lanzhou-Xinjiang Railway and the Ge'ku Railway [2] - The Hefei-Wuhan section of the Yangtze River High-speed Railway has entered full construction phase, with the first steel truss beam of the Shi River Bridge successfully installed. The railway is expected to be completed by 2028 [3] Group 2: Renewable Energy Projects - The expansion of the Tianjin South 1000 kV UHV substation, a key project under the national "14th Five-Year Plan," has commenced operation, capable of transmitting over 40 billion kWh of electricity annually, enhancing the transmission capacity of clean energy from Inner Mongolia and Hebei to Tianjin [4] - The construction of the largest single-unit solar thermal storage project in China, the CGN Delingha 1 million kW solar thermal storage integrated project, has made progress with all heliostats installed and entering the equipment debugging phase. The project is expected to be operational by the end of this year, delivering 1.8 billion kWh of green electricity annually, equivalent to saving about 550,000 tons of standard coal and reducing carbon dioxide emissions by 1.3 million tons [4]
各地扎实推进一批重大工程建设 助力经济高质量发展
Yang Shi Wang·2025-06-08 22:34