Workflow
国道107线东移开封境新建工程项目快速推进
Yang Shi Wang·2025-06-12 10:52

Core Points - The construction of the new project on National Highway 107 in Kaifeng is progressing rapidly, with 76% completion of the side ditch block masonry and flume installation [1][3] - The project is being managed by China Construction Road and Bridge Group, which is optimizing resource allocation and ensuring quality control throughout the construction process [3] - The completion of the side ditch masonry by the end of the month is expected to significantly enhance the road's drainage capacity, improving traffic safety and stability during adverse weather conditions [3] Project Overview - The project starts at the south side of Yanhuang Avenue in the Zhengzhou Airport Economic Comprehensive Experimental Zone and connects to the proposed G107 line, running parallel to the Zhengwan and Zhenghe high-speed rail corridors [1][4] - The main line of the project is designed as a six-lane first-class highway with a design speed of 100 kilometers per hour [1][4] - This project serves as an important transportation link between Zhengzhou, Kaifeng, and Xuchang, facilitating quick connections to the highway network and enhancing the efficiency of the transportation system [4] Economic Impact - The completion of the project will promote the rapid conversion of passenger and freight flows between national and expressways, improving the overall effectiveness of the road network [4] - It is expected to strengthen economic ties and interactions between regions, contributing positively to the high-quality development of the local economy [4]