Core Points - The new train operation schedule effective from July 1 will add 236 passenger trains, providing more options for travelers during the summer season [1] - The new routes will connect popular tourist destinations, enhancing travel convenience and promoting tourism [2][4] Group 1: New Train Routes - A new high-speed train route from Xi'an North Station to Changsha Station will be introduced, offering a direct connection that bypasses traditional routes through Zhengzhou and Wuhan [4] - The new G3763 high-speed train will connect scenic areas such as Hanzhong, Chengdu, and Zhangjiajie, linking rich tourism resources along the way [4] - The Zhangjiajie West Station will see an increase to 108 train services following the opening of the Chongqing to Qianjiang segment on July 1 [4] Group 2: Summer Tourism Lines - Special summer tourism trains have been added, including the "Seaside Tourism Line" for travel along the southeastern coast of Fujian, with trains running every 15 minutes between Fuzhou and Xiamen [6] - Eight additional intercity trains will operate between Nanchang and Jingdezhen, designed to maximize travel during cooler morning and evening hours [6] - The frequency of intercity trains between Ordos and Hohhot has increased from 4 pairs to 10 pairs, with services running throughout the day [8] Group 3: High-Speed Train Standards - Several high-speed rail lines, including the Beijing-Harbin and Beijing-Wuhan segments, are undergoing tests to prepare for regular operations at speeds of 350 km/h [10][11] - The Beijing-Wuhan high-speed rail will add one more train operating at 350 km/h, while the Hangzhou-Changsha segment will introduce 36 benchmark trains [11]
暑期出行需求旺盛 “旅游+铁路”助“燃”各地文旅市场
Yang Shi Wang·2025-06-23 03:59