Workflow
全国最高温里迎来暑运第一天 东航机务机坪护航起落安妥
Zhong Guo Min Hang Wang·2025-07-02 07:48

Core Viewpoint - The article highlights the dedication and efforts of Eastern Airlines' ground staff in ensuring flight safety during the peak summer travel season, despite extreme heat conditions. Group 1: Operational Performance - On July 1, the first day of the summer travel season, Eastern Airlines executed 3,041 flights and transported 424,000 passengers [1] - The maintenance team is focused on short-stop guarantees, which require at least 45 minutes for checks, including 30 minutes for ground inspections and 15 minutes for onboard checks [2] Group 2: Challenges and Solutions - The extreme heat poses challenges for maintenance work, with engine temperatures reaching 200-300 degrees Celsius, necessitating thorough inspections to prevent any issues [2][3] - The team employs digital tools for real-time tracking of maintenance progress and issues, significantly improving efficiency compared to previous paper-based methods [4][5] Group 3: Team Dynamics and Equipment - Team members collaborate closely, with each component being meticulously checked, especially in high-vibration areas like the wings [3] - The company has upgraded its heat protection gear, providing more effective and stylish options for staff working in high temperatures [5] Group 4: Emergency Repairs - During peak travel times, the aircraft utilization rate is critical, and the team prioritizes urgent repairs to minimize delays [6] - Maintenance work is strategically scheduled to take place during cooler hours when possible, but immediate repairs are conducted to ensure timely flight operations [6] Group 5: Commitment and Resilience - The ground staff's commitment is evident as they prepare for incoming flights, demonstrating resilience through their daily routines and efforts [7]