
Core Points - Guangzhou Metro Line 12 has officially opened its east and west sections, spanning a total of 28.8 kilometers with 18 stations, including 7 transfer stations [1][3] - The project faced significant construction challenges, including crossing the Pearl River six times and navigating complex geological conditions, which required innovative construction techniques [3][6] Group 1: Project Overview - The east section runs from Ersha Island to South University Town, while the west section connects Xunfenggang to Guangzhou Sports Center [3] - The construction was led by China Communications Construction Company (CCCC), which was involved in various tasks including civil engineering, track laying, and installation of electromechanical systems [3] Group 2: Construction Challenges - The project involved multiple engineering challenges, such as the need to cross existing metro lines and construct stations on "island" sites with complex geological conditions [3][5] - The construction of the deepest station, Chigang Station, reached a depth of 41 meters, equivalent to a 13-story building, and required innovative methods to address environmental concerns and structural integrity [6] Group 3: Innovative Techniques - CCCC implemented various innovative construction techniques, such as the use of a large-diameter shield tunneling machine and advanced geological detection methods to ensure safety and efficiency [6] - The construction team optimized construction plans and resource allocation to overcome challenges, completing certain phases ahead of schedule [5][6]