Workflow
年发绿电1670万千瓦时

Core Insights - The project is China's first industrial operational floating photovoltaic project in a full seawater environment, with a capacity of 7.5 megawatts, generating 16.7 million kilowatt-hours of green electricity annually, reducing CO2 emissions by 14,000 tons, equivalent to planting 750,000 trees [2][3][4] Group 1: Project Overview - The floating photovoltaic power station occupies an area of approximately 60,000 square meters and features zero emissions, high efficiency, and low costs [2][3] - The project utilizes a floating photovoltaic structure that synchronizes with tidal movements, reducing the distance between the panels and the water surface to about 1/10 of traditional pile-based structures, enhancing power generation efficiency by 5%-8% through seawater cooling [3] Group 2: Technological Innovations - The project addresses challenges such as seawater corrosion and biological attachment by developing specialized floating bodies and supports resistant to salt mist and barnacle attachment [3] - A new underwater anchoring system that withstands level 13 winds and accommodates 3.5 meters of tidal fluctuation has been created, reducing investment costs by approximately 10% compared to traditional pile-based photovoltaic systems [3] - The design includes an inspection passage close to the water surface, significantly improving safety and reducing operational costs compared to traditional systems [3] Group 3: Strategic Development - The completion of the floating photovoltaic project integrates the company's renewable energy supply chain, establishing a "photovoltaic to green electricity, green electricity to green hydrogen" model, which supports the high-quality coupling of hydrogen energy and photovoltaic development [4] - The company plans to expand its floating photovoltaic capacity by an additional 23 megawatts, promoting the transformation of traditional energy industries and green development [4]