Core Viewpoint - The successful completion of the 110 kV power line project in Gansu Zhangye, which traverses the Qilian Mountain National Nature Reserve, emphasizes the importance of balancing ecological protection with regional economic development [1][2]. Group 1: Project Overview - The project aims to address the urgent need for an upgraded power supply to the Qiqing Industrial Park in Zhangye, which is hindered by the existing power grid's limitations [1]. - The construction site is located at an altitude of nearly 3000 meters, requiring careful environmental and water conservation measures due to its proximity to a protected ecological area [1][2]. Group 2: Environmental Protection Measures - The project incorporates high-span design to minimize the impact on the environment, and construction is scheduled to avoid the wildlife breeding season [1]. - Special funds have been allocated for post-construction vegetation restoration, ensuring that ecological integrity is maintained throughout the project lifecycle [1]. Group 3: Technical Supervision and Challenges - The Gansu Electric Power Research Institute has implemented comprehensive technical supervision to ensure that environmental protection measures are effectively executed on-site [2]. - Despite challenging weather conditions and high-altitude difficulties, technical personnel have conducted thorough inspections of 28 tower sites to assess the implementation of water conservation measures [2].
国网甘肃电科院:守护祁连生态屏障 筑牢电网环保防线