Core Viewpoint - Leshan Electric Power Co., Ltd. has made significant progress in its energy storage projects, with two major 100MW/200MWh electrochemical energy storage stations being included in the Sichuan provincial grid-side new energy storage project list for 2025 [1][2]. Group 1: Project Developments - The Chengdu Qingshan District 100MW/200MWh electrochemical energy storage station project has been officially included in the Sichuan provincial grid-side new energy storage project list for 2025 [1]. - The company completed a simplified procedure for issuing A-shares on February 20, 2025, raising a net amount of 198.13 million yuan for the construction of the Longquanyi District 100MW/200MWh electrochemical energy storage station [1]. Group 2: Operational Impact - The project is expected to undergo network testing after commissioning, with commercial operation anticipated to begin in approximately three months [2]. - The impact of the project on the company's 2025 operating performance cannot be accurately measured at this time, with final figures to be determined in the audited annual financial report [2].
乐山电力: 乐山电力股份有限公司关于相关业务的进展公告