
Core Viewpoint - China Railway Sixth Group Co., Ltd. (CRSG) received an administrative penalty for not adhering to construction technical standards during the construction of the Beijing Suburban Railway Urban Sub-center Line project [1][4]. Group 1: Administrative Penalty Details - The penalty was issued on July 14, 2025, with the administrative penalty decision number 京建法罚(市)字[2025]第010167号 [1][4]. - The penalty amount is 2.043058 yuan [4]. - The violations were identified during an inspection on April 30, 2025, which revealed issues with the quality acceptance records of concrete works [2][3]. Group 2: Violations and Findings - Specific violations included the lack of supervisory unit signatures on quality acceptance records for concrete works, which were deemed acceptable despite missing critical documentation [2][3]. - The construction project involved the "Yaba River Frame Bridge" concrete sub-project, with a contract value of 817,223 yuan [3]. - The quality acceptance records were incomplete, violating the "Standards for Quality Acceptance of Railway Bridges and Culverts" [3]. Group 3: Company Overview - CRSG is a large state-owned enterprise and a wholly-owned subsidiary of China Railway Group Limited, one of the largest construction contractors globally [6]. - The company has a registered capital of 2.2 billion yuan and employs over 13,000 people, managing over 350 ongoing projects across various construction sectors [6][7]. - CRSG holds multiple construction qualifications, including special-grade qualifications for railway, building, and highway engineering [6].