Workflow
INTEGRA ANNOUNCES RESULTS FROM NEAR-MINE OXIDE GOLD DRILLING AT FLORIDA CANYON; GROWTH POTENTIAL CONFIRMED AND DRILL PROGRAM EXPANDED

Core Viewpoint - Integra Resources Corp. has announced initial results from its 2025 resource growth drilling program at the Florida Canyon Mine, aiming to expand mineral reserves and resources, extend mine life, and enhance the mine's value [1][4]. Group 1: Drilling Program Overview - The 2025 growth drilling program targets three key areas: near-surface oxide potential from historical low-grade gold-mineralized waste, expanding in-situ resources between existing mine open pits, and testing lateral extensions and in-pit infill drilling [2][12]. - The drill program's scope has been increased from approximately 10,000 meters to 16,000 meters due to initial drilling success, with about 5,700 meters of reverse circulation drilling completed to date [2][10]. Group 2: Opportunity 1 - Near-Surface Oxide Potential - Initial results from the North Mine Dump indicate broad, near-surface intervals of oxide gold mineralization, with significant gold grades and excellent heap leach potential [4][8]. - Key intercepts include: - FCM25-0569: 0.28 grams per tonne (g/t) oxide gold over 68.6 meters - FCM25-0570: 0.36 g/t oxide gold over 71.6 meters - FCM25-0575: 0.37 g/t oxide gold over 47.2 meters, including 4.53 g/t oxide gold over 1.5 meters - Approximately 70% of drill intercepts exceed the current mine cut-off grade of 0.11 g/t gold [9][16]. Group 3: Opportunity 2 - Expanding In-Situ Resources - Drilling in the Inter-Pit areas has confirmed broad, near-surface intervals of gold mineralization with consistent grades, indicating potential for resource expansion [12][16]. - Notable intercepts include: - FCM25-0588: 0.47 g/t gold over 39.6 meters (North Pit) - FCM25-0591: 0.27 g/t gold over 114.3 meters (Central/Radio Tower Saddle) - FCM25-0600: 0.25 g/t oxide gold over 73.2 meters (Central/Radio Tower Saddle) - Approximately 40% of drill intercepts within the Radio Tower Pit exceed the current mine cut-off grade of 0.14 g/t gold, while about 35% of remaining Inter-Pit intercepts exceed 0.11 g/t gold [16][18]. Group 4: Future Plans and Expectations - The 2025 drill program is expected to support a mineral resource and reserve update, along with a revised life-of-mine plan in the first half of 2026 [11][19]. - Preliminary volume and grade estimation work is underway for the North Dump and South Dump, with further details anticipated in the coming months [11][10].