Workflow
官宣北京地铁18号线来了,地铁1号线到19号线有望全部补齐
Xin Jing Bao·2025-08-06 01:35

Core Viewpoint - The Beijing subway system is set to expand with the introduction of Line 18, which is part of the 13-line capacity enhancement project, enhancing connectivity in northern Beijing and improving public transportation for residents in multiple districts [1][5][6]. Group 1: Project Overview - The 13A line within the capacity enhancement project has been officially named Line 18, which will connect with Line 17 at Tiantongyuan East Station, scheduled to open in December 2025 [1][3]. - The 13-18 northern section connection line has successfully completed cold and hot sliding tests, validating the compatibility and operational stability of the related systems, paving the way for future train debugging and full line operation [5][6]. - The 13-line capacity enhancement project is the largest existing line renovation project in China, involving the construction of 29 kilometers of new track and 18 new stations, alongside the renovation of 5 existing stations [5][6]. Group 2: Connectivity and Impact - The completion of the 13-line enhancement will significantly increase the rail network density in northern Beijing, linking major residential areas and improving transfer relationships between existing lines [6][8]. - The project aims to enhance the commuting experience for residents in Haidian and Changping districts by connecting with other lines such as Line 8 and Line 17, thus facilitating smoother transfers [8]. - The total length of the new lines will reach 63.6 kilometers with 33 stations, ensuring interconnectivity and future operational flexibility [5][6].