Group 1 - The 13A line of the Beijing subway has been officially renamed as Line 18, with the 17th line connecting through Tiantongyuan East Station, which is set to be operational by December 2025 [1] - The expansion project of Line 13 is the first large-scale "new construction + renovation" subway project in China, involving the largest scale of existing line renovation [1] - The construction plan includes splitting the existing "U" shaped line of Line 13 and building an "X" shaped east-west line between Line 16 and Line 17, resulting in two lines totaling 63.6 kilometers and 33 stations [1] Group 2 - The Beijing Subway Operations Company has conducted effective cold and hot sliding tests at the Xiaoxin Zhuang parking lot, validating the equipment compatibility and operational stability for the upcoming line operations [2] - The 13-18 northern section connection line is progressing towards smooth operation, with plans for vehicle debugging and project acceptance [2] - As of July, the construction of the Line 13 expansion project from Malianwa to Tiantongyuan East has reached 80% completion in equipment installation and decoration [2]
北京地铁将迎来18号线 计划年底与17号线贯通运营
Bei Jing Shang Bao·2025-08-06 07:52