Workflow
“汛”速响应 中国航油广州管道中心全力守护汛期供油安全
Zhong Guo Min Hang Wang·2025-08-08 04:58

Core Viewpoint - The article highlights the proactive measures taken by China Aviation Oil Guangzhou Pipeline Center in response to severe rainfall and potential geological hazards, ensuring the safety and continuity of fuel supply to Guangzhou Baiyun Airport. Group 1: Emergency Response and Preparedness - During the severe rainfall from August 2 to 6, Guangzhou experienced its strongest rain event of the year, prompting the company to implement a comprehensive flood prevention strategy [1] - The company conducted training sessions and established a 24-hour flood duty system, forming an emergency rescue team to ensure readiness [1] - An emergency plan was activated when water levels around the Guangzhou second aviation oil pipeline valve room rose rapidly, leading to immediate actions to prevent electrical equipment from flooding [2] Group 2: Monitoring and Risk Management - The company utilized an intelligent inspection system to monitor key pipeline areas, integrating manual inspections, drone surveillance, and geological monitoring equipment [1] - Following the heavy rains, a landslide occurred near the pipeline, prompting immediate on-site inspections and the identification of minor landslide risks, which were deemed manageable [6] - The company is continuously analyzing geological monitoring data to optimize warning thresholds for future geological disaster responses [8]