Workflow
30亿元固态电池产业项目签约

Core Viewpoint - The signing of the Guosheng (Tieling) Future Energy Industrial Park project marks a significant investment in the renewable energy sector, with a total investment of 3 billion yuan aimed at establishing a comprehensive industrial chain for high-performance solid-state battery materials and advanced renewable energy technologies [1] Group 1: Project Overview - The Guosheng (Tieling) Future Energy Industrial Park project has a total investment of 3 billion yuan and covers an area of 230 acres, located at the former Jibao Automobile Factory in the Tieling Economic and Technological Development Zone [1] - The project will be developed in two phases, focusing on the production and recycling of high-performance solid-state battery anode and cathode materials, cell manufacturing, and Pack line operations [1] - The project aims to explore integrated applications of "wind-solar-storage" technologies and establish itself as a benchmark for the Northeast renewable energy industry [1] Group 2: Company Background - Guosheng Energy Co., Ltd. was established in 2022, with its main business activities including solar thermal power generation products, solar thermal power generation equipment, generator sets, photovoltaic equipment, and battery manufacturing [1] - Guosheng Technology (603778) has accumulated photovoltaic module orders totaling 2.685 billion yuan and has established five production bases in Jiangsu Xuzhou, Anhui Huaibei, Huainan, Suzhou, and Hebei Zhangjiakou, with additional bases under construction in Shandong Laizhou, Xinjiang Ruoqiang, Hebei Tangshan, and Inner Mongolia Ulat Front Banner [1]