Core Viewpoint - The "Long Palace" marine ranch, constructed by Tian Shun Wind Power and invested by State Power Investment Corporation, has successfully completed its delivery and is heading to the offshore wind farm operation area in Jieyang, Guangdong [1] Group 1: Project Overview - The "Long Palace" marine ranch is a key equipment for the Jieyang marine ranch legged (truss) heavy net cage experimental project [1] - The platform is designed with a pile foundation fixation method, featuring strong resistance to wind and waves, capable of withstanding a level 17 typhoon [1] Group 2: Technological Features - The platform is equipped with multiple functions including automatic feeding, live fish catching, net cleaning, and intelligent monitoring of the fishery [1] - The project emphasizes technological innovation and efficient execution throughout its development [1] Group 3: Design and Construction Achievements - During the design phase, the project was guided by the principle of "technology empowering ecology," establishing a framework that integrates wind energy, fishery, and ecology [1] - The construction team at Jieyang base completed the project in 3 months, setting a record for similar projects with "millimeter-level precision" [1] Group 4: Standards and Efficiency - The acceptance and delivery of the project adhered to dual standards of marine engineering and fishery breeding, efficiently completing the transfer based on precise planning [1]
天顺风能大型海洋牧场 “龙宫” 号近日从揭阳海工基地发运