Core Viewpoint - China Hongwang (03788) has updated the feasibility studies for its MtBundy and Cygnet gold projects, indicating a significant increase in the total recoverable gold resources and an expected annual gold production exceeding 200,000 ounces [1] Group 1: Project Updates - The final feasibility study for the MtBundy gold project has been completed, increasing the recoverable resource to 3.1 million ounces of gold from a total resource of 5.07 million ounces [1] - The pre-feasibility study for the Cygnet gold project has also been updated, with recoverable resources based on the economic portion of the mineral resources [1] Group 2: Production Expectations - The combined annual gold production from both projects is projected to exceed 200,000 ounces [1] - The company plans to enhance the recoverable resource estimates through further drilling, testing, and optimization, particularly for the Cygnet project, which aims for its first ore reserve estimate in the second half of 2025 [1]
中国罕王(03788):MtBundy金矿项目及Cygnet金矿项目的计划年黄金产量预计超20万盎司