Core Insights - The Uzbekistan Tashkent 20 MW green hydrogen project, designed by China Chemical's Donghua Engineering Technology Co., has successfully produced hydrogen with a purity of 99.99%, marking it as the first green hydrogen project in Central Asia to enter the implementation phase [1][2] - The project is a key component of Uzbekistan's government "green energy strategy" and is the first green hydrogen project independently developed by international energy giant ACWA Power [1] Group 1 - The project is located within the MAXAM chemical plant in Tashkent, Uzbekistan, and utilizes alkaline water electrolysis technology [1] - It is equipped with four alkaline electrolyzers with a capacity of 1000 standard cubic meters per hour each, along with a rectifier, control system, gas-liquid separation, and purification systems, designed for a maximum production capacity of 4000 standard cubic meters per hour of high-purity hydrogen [1] - Upon completion, the project is expected to produce over 3000 tons of green hydrogen annually, reducing approximately 30,000 tons of CO2 emissions per year compared to the previous gray hydrogen production model [1] Group 2 - Since the project's launch in October 2023, the project team has overcome multiple challenges, including complex design standards and a variety of deliverables, successfully completing detailed engineering design work by December 2024 [2] - The company places a high emphasis on the development of the green hydrogen industry, having undertaken over 50 projects related to green hydrogen, green ammonia, green methanol, and SAF, accumulating rich engineering practice experience [2]
中亚首个绿氢项目产出合格氢气