Core Viewpoint - The district emphasizes the development of the renewable energy industry as a key support for energy security and green transformation [1] Group 1: Renewable Energy Projects - The construction of photovoltaic and wind energy projects in Yicheng District is progressing as planned, leading to a significant increase in installed capacity for renewable energy [3] - The Three Gorges Energy 50 MW photovoltaic project successfully connected to the grid in May 2023, with an expected annual generation of over 60 million kWh [3] - A 100 MW centralized wind power project has completed initial site selection and resource assessment, while 115 MW of "Wind Action" and decentralized wind projects are optimizing turbine locations and preparing feasibility studies [3] Group 2: Installed Capacity and Energy Supply - As of now, the total installed power capacity in Yicheng District is 951,100 kW, representing a year-on-year growth of 23.64% [5] - The total installed capacity of renewable energy is 527,100 kW, accounting for 55.42% of the total power capacity, surpassing traditional thermal power to become the largest energy source [5] - The ongoing commissioning of renewable energy projects provides stable and reliable electricity supply while reducing dependence on traditional fossil fuels, achieving a win-win for energy stability and ecological protection [5]
峄城区电力装机总容量增长23.64%,新能源成第一大电源