Core Viewpoint - The successful commissioning of the first unit of the Meizhou Pumped Storage Power Station Phase II marks a significant milestone in China's pumped storage sector, enabling immediate market participation and enhancing the regulation capacity of the new power system [1][9]. Group 1: Project Overview - The Meizhou Pumped Storage Power Station Phase II was approved in December 2021 and commenced construction in September 2022, with the first unit now operational [1]. - The total investment for the Meizhou Pumped Storage Power Station is approximately 12 billion yuan, making it the largest pumped storage project in the Guangdong-Hong Kong-Macao Greater Bay Area [13]. Group 2: Technical Specifications - The newly commissioned unit has a total weight of about 2,000 tons and a height exceeding 30 meters, equivalent to a 10-story building [3]. - The unit can convert 300,000 cubic meters of water into 300,000 kilowatt-hours of clean electricity per hour, meeting the daily electricity needs of 50,000 households [2]. Group 3: Market Participation and Performance - The Meizhou Pumped Storage Power Station has already participated in the electricity market, trading a total of 1.74 billion kilowatt-hours and responding to market demands over 4,200 times, with a 37% increase in daily activation frequency compared to before market entry [6][9]. - The station's market trading capacity has reached 1.5 million kilowatts, making it the leader in the national pumped storage market [8][9]. Group 4: Environmental and Regulatory Impact - The pumped storage power station is designed to support the integration of renewable energy sources like wind and solar, acting as a "battery" for the new power system [10]. - The project adheres to strict environmental standards, achieving zero wastewater discharge and implementing advanced technologies for noise control and dust suppression [11]. Group 5: Future Prospects - Upon completion of the remaining three units, the total installed capacity of the Meizhou Pumped Storage Power Station will reach 2.4 million kilowatts, with an annual clean energy consumption capacity of approximately 7.2 billion kilowatt-hours [13].
“十四五”粤港澳大湾区首个抽蓄工程首台投产