盘兴高铁启动联调联试,进入工程验收关键阶段
Xin Jing Bao·2025-09-07 09:04

Core Viewpoint - The Panxun High-Speed Railway (盘兴高铁) has entered a critical phase of engineering acceptance with the commencement of joint debugging and testing, laying a solid foundation for its timely opening [1] Group 1: Project Overview - The Panxun High-Speed Railway is designed for a speed of 250 km/h and has a total length of approximately 98 kilometers, with 46 bridges and 38 tunnels, making up 90.66% of the route [1] - The railway starts from the Panzhou Station on the Hukun High-Speed Railway and passes through various towns in Liupanshui City and ends at Xinyi South Station in the Qiannan Buyi and Miao Autonomous Prefecture [1] Group 2: Economic and Social Impact - Once operational, the railway will reduce travel time from Guiyang to Xinyi to about 2 hours, creating a high-speed rail traffic circle within 1 to 2 hours for 8 cities (prefectures) in the province [1] - The completion of the Panxun High-Speed Railway is expected to enhance the regional railway network layout, promote local economic and social development, and strengthen inter-regional connectivity [1]