Workflow
中能建松原氢能产业园年内投产
Yang Shi Wang·2025-09-11 06:10

Group 1 - The Zhongnengjian Songyuan Hydrogen Energy Industrial Park in Jilin Province is the largest integrated green hydrogen and ammonia project globally, with a total investment of 29.6 billion yuan [1] - The project is a key engine for building the "Northern Hydrogen Valley" strategy in Jilin Province, with a planned capacity of 3 million kilowatts of renewable energy generation and an annual production of 800,000 tons of green synthetic ammonia and green methanol [1] - The first phase of the project has a total investment of 6.946 billion yuan, which includes the construction of an 800,000-kilowatt renewable energy generation facility and an annual production capacity of 200,000 tons of green synthetic ammonia and green methanol, expected to be operational in the second half of 2025 [1] Group 2 - The project utilizes a "direct supply of renewable energy for chemical production" model, incorporating technologies such as precise matching of source-network-load-storage, direct supply of renewable energy, new hydrogen storage, and flexible synthetic ammonia production [1] - The project aims to address the coordination issues between the volatility of renewable energy and the stability of chemical production, exploring cross-industry linkage of "electricity-hydrogen-ammonia (methanol)" for large-scale green hydrogen applications [1] - After the first phase is completed, the project is expected to generate an annual output value of 1 billion yuan (including wind power) and create 300 new jobs locally [2]