Core Viewpoint - The successful installation of the "Long Palace" marine ranch by State Power Investment Corporation in Guangdong marks the official launch of the first wind-fish integration pilot project in Jieyang, Guangdong [1] Group 1: Project Overview - The "Long Palace" is located within the 502,000 kW offshore wind power project in Jieyang, approximately 30 kilometers offshore [1] - The total investment for the project is 128 million yuan, with the structure measuring 46 meters in length, 46 meters in width, and 56.8 meters in height, weighing approximately 3,822 tons [1] - The facility has a water capacity of over 70,000 cubic meters and consists of an upper platform (living area, mechanical area) and lower aquaculture cages [1] Group 2: Technological Features - The project is equipped with multiple functions including centralized aquaculture control, automatic feeding, net cleaning, environmental monitoring, and underwater biological identification [1] - It utilizes photovoltaic and wind turbine energy for green power supply [1] Group 3: Economic and Industrial Impact - As the first marine ranch project by State Power Investment Corporation, "Long Palace" achieves a full-process closed loop of local manufacturing, transportation, and construction [1] - The project is expected to bring orders to the park, reduce transportation costs, and accumulate experience in the shipment of oversized marine steel structures at the only port in Guangdong, Qianzhang General Terminal [1] - It aims to leverage regional industrial resource synergy and provide a replicable model for similar projects [1]
国家电投首个风渔融合试验项目下水投运