Workflow
横琴供用电实施细则落地:供电助力营商环境升级、新能源配套加速
2 1 Shi Ji Jing Ji Bao Dao·2025-09-16 12:36

Core Viewpoint - The implementation of the "Implementation Rules for Power Supply and Use in the Hengqin Guangdong-Macao Deep Cooperation Zone" aims to enhance the business environment and accelerate the integration of renewable energy, marking a significant upgrade in the power supply regulations in Hengqin [1][2]. Group 1: Regulatory Framework - The "Implementation Rules" cover various aspects including power grid planning, parallel approval mechanisms for power supply facilities, and the promotion of green and low-carbon electricity [1][2]. - The introduction of a "credit-based electricity service" model simplifies the process for users in the cooperation zone, allowing them to use credit reports instead of property ownership documents for electricity applications [8][11]. Group 2: Infrastructure Development - The new rules require that power grid planning aligns with overall land use and urban development plans, ensuring that electricity infrastructure is integrated into the broader urban development strategy [3][11]. - The "exemption from capacity calculation" policy allows power supply facilities to be excluded from the calculation of building volume, thus reducing operational costs for businesses [4][11]. Group 3: Energy Reliability and Charging Infrastructure - Hengqin is developing a high-reliability power grid structure to support the growing demand from energy-intensive industries such as data centers and semiconductor manufacturing [7]. - New regulations mandate that at least 30% of parking spaces in new public parking lots must be equipped with charging facilities, ensuring adequate infrastructure for electric vehicles [9][10].