Workflow
广东两条城际铁路开通在即 广州30分钟可抵达佛山东莞中心城区
Nan Fang Ri Bao Wang Luo Ban·2025-09-17 07:56

Core Insights - Guangzhou Metro is set to open two new intercity rail lines, the Guangzhou East Ring Intercity Railway and the Palian Intercity Railway, before the National Games, enhancing connectivity in the Guangdong-Hong Kong-Macao Greater Bay Area [1][2] Group 1: New Rail Lines - The Guangzhou East Ring Intercity Railway (Panyu to Baiyun Airport North) spans 57.8 kilometers with 13 stations, while the Palian Intercity Railway is 18.2 kilometers long with 4 stations [2] - Upon opening, the intercity network will operate 8 routes, connecting key transport hubs and business districts, facilitating travel between Guangzhou South Station, Guangzhou North Station, Baiyun Airport, and other significant locations [2] Group 2: Transportation Network - The intercity rail network will enable travel within 30 minutes to central areas of Foshan and Dongguan, 60 minutes to Zhaoqing and Huizhou, and 90 minutes to Qingyuan, forming a "306090" transportation circle in the Greater Bay Area [2] - This development aims to improve the convenience of intercity travel for residents and visitors, particularly for attending the National Games [2] Group 3: Operational Features - The intercity rail will adopt a public transport-style operation with various service types, including "stop at every station," "fast trains," and "direct trains," enhancing service efficiency [3] - Ticketing will utilize a dual system allowing for multiple payment methods without the need for seat reservations, streamlining the boarding process for passengers [3]