Core Insights - The company Dazhong Mining (001203) announced that the resource quantity of the Sichuan Gada Lithium Mine's first mining area has been approved by the Ministry of Natural Resources, with a total ore quantity of 43.436 million tons and a Li2O mineral quantity of 600.9 thousand tons, exceeding the company's expectations [1] Group 1 - The lithium ore resource quantity is 43.436 million tons, with an average grade of 1.38%, equivalent to approximately 148.42 thousand tons of lithium carbonate [1] - The company is advancing the procedures for exploration to mining transition and is conducting exploration outside the first mining area [1] - As of August 20, the company has completed 15,100 meters of drilling with a mineral discovery rate of 95% [1] Group 2 - The company has deployed two shield machines for simultaneous construction of exploration tunnels and shafts to facilitate subsequent engineering [1] - The company has determined the process flow for heavy flotation and combined selection in the beneficiation aspect [1] - Preliminary design and safety facility design for the tailings pond have been completed and reviewed by external experts [1]
大中矿业:2025年上半年四川加达锂矿首采区2.056平方公里的资源量完成自然资源部评审备案