管具技术服务中心危废处置“五即”模式落地见效

Core Points - The successful integration of the fixed hazardous waste monitoring and online weighing system with Shandong Province's "Waste-Free Shandong" smart management platform marks the implementation of the "Five Immediate" management model for hazardous waste [1][2] - The "Five Immediate" model includes immediate generation, packaging, weighing, coding, and storage of hazardous waste, enabling intelligent control throughout the entire process from generation to disposal [1] - The standardized warehouse provides the physical infrastructure and hardware support for the "Five Immediate" management, significantly reducing the time waste remains in intermediate stages and enhancing management efficiency and safety levels [1] Summary by Sections - Implementation of the System - The completion of the system is a practical application of the safety production work deployment by the tool technology service center [2] - The dual prevention system of "human defense + technical defense" achieves a closed-loop management of hazardous waste from generation to disposal [2] - Infrastructure Improvements - Comprehensive renovations were made to the customized processing center's warehouse, enhancing safety features such as anti-seepage, ventilation, and fire protection [1] - The scientific planning of partitioning provides the physical conditions for immediate packaging and classified storage [1] - Technological Integration - The intelligent video monitoring system is directly linked to the provincial platform, allowing real-time access to the entire process of hazardous waste operations by provincial regulatory authorities [1] - The established identification system offers visual guidance for coding and process traceability [1]