北京热力即将开始供暖试水,如有“跑冒滴漏”及时报修
Xin Jing Bao·2025-09-22 03:25

Core Points - Beijing Heating has initiated the trial water pressure testing for the heating system ahead of the 2025-2026 heating season to ensure optimal performance during winter [1] - Residents are advised to pay attention to community notifications regarding the testing schedule, as there is no unified date for the trial [1] - The trial involves filling the heating pipes with water to maintain working pressure and check the system's operation [1] Group 1 - The trial water pressure testing is a routine procedure conducted before each heating season, crucial for ensuring heating quality [1] - Residents should remain at home during the testing, especially those who have made modifications to their heating systems, to promptly address any leaks [2] - In case of any issues such as leaks, residents are encouraged to contact the Beijing Heating service hotline for repairs [2] Group 2 - Residents can manually release air from the heating system using the air release valve if they hear water sounds in the radiators [1] - Precautions should be taken to prevent water from splashing during the air release process, such as using a plastic bottle or cloth [1] - Immediate action is required if the air release valve is accidentally removed, including closing the household shut-off valve and contacting the heating service [1]

北京热力即将开始供暖试水,如有“跑冒滴漏”及时报修 - Reportify