Core Insights - The Luling Mine's waste heat utilization project has successfully commenced operations, featuring the addition of 6 units of 1000kW and 4 units of 750kW generators, which convert waste heat into clean steam, saving over 500,000 cubic meters of natural gas annually, achieving cost reduction, energy saving, and environmental protection [1][2] - The project is a response to the national "dual carbon" goals, with significant upgrades made to the existing waste heat boiler systems, enhancing efficiency and reducing reliance on natural gas [1][2] Investment and Financial Impact - The total investment for the project is 2.6 million yuan, which includes the addition of 10 high-efficiency waste heat boilers and a supporting circulation system [2] - As of August this year, the system's natural gas consumption was only 256,426 cubic meters, a reduction of approximately 480,000 cubic meters compared to the same period last year, with an expected annual savings of over 2 million yuan in operational costs [2] Environmental and Operational Benefits - The successful upgrade of the waste heat boiler system emphasizes cost reduction, efficiency improvement, and energy conservation, reinforcing the commitment to technological advancement and green development [2] - The mine plans to further enhance energy efficiency by exploring the application of clean energy sources such as solar and geothermal energy in the mining area [2]
淮北矿业集团芦岭矿:改造余热锅炉系统 年省天然气超50万m³