Workflow
接龙下水和“试航” ,扬州造船业开启“加速度”

Group 1 - Three newly built vessels were safely launched on the same day in the Yangtze River section of Yangzhou, with one vessel successfully completing a full trial voyage across water areas from Jiangsu to east of Shanghai [2][4] - The newly launched heavy-lift vessel "CSPC LIBRA" measures 225 meters in length and has a total tonnage of 84,500 tons, being the sixth of ten vessels in its series [2] - The other two vessels launched by Hai Run Shipyard are deck barges, with "CSPC VIRGO" measuring 225 meters in length, 36 meters in width, and a total tonnage of 54,832 tons [2] Group 2 - The trial voyage for "CSPC VIRGO" was conducted under the supervision of Yangzhou Maritime, showcasing the department's cross-regional collaboration and professional support capabilities [4] - The trial voyage involved navigating through the South Channel exit of the Yangtze River to designated offshore testing areas, requiring two tidal passages with a maximum draft of 6.5 meters [5] - Yangzhou Maritime implemented a specialized regulatory system focusing on both inland navigation safety and offshore testing support, ensuring compliance and safety through thorough inspections and monitoring [5]