Workflow
广东多个重大项目迎来关键突破 跑出建设“加速度”
Nan Fang Ri Bao Wang Luo Ban·2025-09-30 08:07

Group 1 - The construction of the main structure of the Foshan Station for the Guangzhan High-speed Railway has been completed, with the project now entering the decoration and renovation phase [1] - The Guangzhan High-speed Railway is in the final stages of preparation for operation, significantly reducing travel time from Guangzhou to Zhanjiang to 1.5 hours upon completion by the end of this year [1] - The Shantou South to Shantou section of the Shanshan High-speed Railway has officially entered the track-laying phase, aiming to enhance transportation capacity from an average of 24 pairs of trains per day to over 50 pairs [2] Group 2 - The Changshen Expressway expansion project has completed the main bridge construction, transitioning to the final stages of road surface and ancillary works, with a total length of approximately 116.6 kilometers [2] - The expansion project is a key initiative under Guangdong's 14th Five-Year Plan, aimed at strengthening connections between the Guangdong-Hong Kong-Macao Greater Bay Area and central regions like Jiangxi [2] - The first phase of the Bay Area University (Binhaiwan Campus) has successfully topped out, marking significant progress in higher education infrastructure in the Greater Bay Area [3] Group 3 - The Bay Area University project will cover an area of approximately 67,000 square meters, addressing the shortage of high-level engineering education resources in the region [3] - The Guangzhou Baiyun Station's TOD integrated transport hub has completed the construction of four towers, which will serve as a key driver for regional economic development [3]