Core Insights - The Xiongbao Railway double-track project enhances coal transportation capacity, contributing to China's "West-to-East Coal Transport" strategy [1][4] - The project includes a new 21.8 km railway line, with significant infrastructure such as 15 bridges and 8 tunnels, and aims for a coal handling capacity of 20 million tons per year [1][4] - The project is managed by China Railway Engineering Design Consulting Group, focusing on comprehensive engineering management and safety measures [1][2][4] Infrastructure Development - The Xiongbao Railway double-track project is a key infrastructure initiative in Shanxi Province, located in the core energy corridor of Jin-Shaan-Meng [1] - The project features a bridge-tunnel ratio of 60.25%, with a total bridge length of 4.3 km and tunnel length of 8.8 km [1] - Upon completion, the railway is expected to achieve an annual transportation capacity of 50 million tons, improving the regional railway network [4] Safety and Management - The management team has implemented innovative safety designs to ensure automatic safety responses during equipment failures [2] - A comprehensive project management system has been established, focusing on quality, safety, schedule, and investment efficiency [4] - The project emphasizes collaborative efforts and strict management to achieve zero accidents and enhance investment efficiency [4]
兴保铁路复线冯家川站新建装车环线正式投运
Yang Shi Wang·2025-09-30 10:18