Core Points - The company reported that the total water inflow for the Wudongde Reservoir was approximately 83.489 billion cubic meters, a decrease of 6.04% compared to the same period last year [1] - The total water inflow for the Three Gorges Reservoir was approximately 298.880 billion cubic meters, a decrease of 4.54% compared to the same period last year [1] - The total power generation from the company's six domestic cascade power stations for the first three quarters of 2025 was approximately 235.126 billion kilowatt-hours, remaining stable compared to the same period last year [1] - In the third quarter, the total power generation from these power stations was approximately 108.470 billion kilowatt-hours, a decrease of 5.84% compared to the same period last year [1]
中国长江电力股份有限公司2025年三季度发电量完成情况公告