Core Viewpoint - The successful impoundment of water at the Huadian Jinshang Yebatan Hydropower Station marks a significant milestone in China's "14th Five-Year Plan" major projects, with the first batch of generating units set to begin operation soon [1] Group 1: Project Details - The Yebatan Hydropower Station is located on the Jinsha River, at the border of Baiyu County in Sichuan Province and Gongjue County in Tibet, and is a key component of the upstream clean energy base on the Jinsha River [1] - The station has an average elevation of 3,000 meters, a maximum dam height of 217 meters, a total installed capacity of 2.24 million kilowatts, and a total reservoir capacity of 1.08 billion cubic meters [1] Group 2: Environmental Impact - Once operational, the hydropower station is expected to generate an average annual electricity output of over 10.2 billion kilowatt-hours, which is equivalent to saving nearly 4 million tons of standard coal each year [1] - The project is projected to reduce carbon dioxide emissions by approximately 7.37 million tons annually, contributing to cleaner energy production [1] Group 3: Energy Transmission - The clean electricity generated will be transmitted to Central China through the Jinshang to Hubei ±800 kV UHVDC transmission project [1]
国家“十四五”规划重大工程 叶巴滩水电站下闸蓄水