Workflow
供销社党组织联动企业搭建“烘干保障线” 与时间赛跑全力守护秋粮
Yang Shi Wang·2025-10-14 06:38

Core Viewpoint - Continuous rainy weather poses significant challenges to autumn harvest, prompting various regions to implement measures for timely collection and drying of crops [1] Group 1: Harvesting Efforts - Farmers in multiple towns of Fengxian, Xuzhou, Jiangsu Province are racing against time to harvest mature corn during breaks in the rain, utilizing over 360 tracked corn harvesters since October [4] - In Qingxu County, Shanxi Province, 11.7 million mu of corn have been harvested out of a total planting area of 22.5 million mu, with remaining corn requiring drainage before harvesting [6] Group 2: Machinery Adaptations - In Xi'an, Shaanxi Province, local agricultural machinery departments are advising farmers to add "floating wheels" to harvesters to improve mobility in wet fields, with 668,700 mu of corn and 824,500 mu of wheat harvested as of October 12 [11] Group 3: Drying and Storage Solutions - In Handan, Hebei Province, local supply cooperatives are collaborating with grain purchasing and drying enterprises to establish a "drying guarantee line" to minimize grain loss [13][14] - As of now, over 3,000 tons of wet grain have been dried to ensure quality and reduce losses [16] Group 4: Water Management and Infrastructure - In Heze, Shandong Province, local governments are deploying large excavators to clear and dredge existing ditches to manage water accumulation in low-lying areas [19] - The State Grid in Jinan is conducting inspections to ensure reliable power supply for drying facilities, having identified and rectified 28 power supply hazards [21] Group 5: Harvesting Statistics - As of now, over 37.11 million mu of corn have been harvested in Shandong Province, accounting for approximately 63.5% of the total area [23]