Baru Gold Completes Area Survey in Preparation of Production Plant Construction & Drill Program

Core Viewpoint - Baru Gold Corp. and its subsidiary PT. Tambang Mas Sangihe are making significant progress in preparing for production at the Sangihe Gold Project while awaiting approval for production operations [1]. Production Readiness - The company has completed a multi-week land and aerial survey using drone-based LiDAR scanning and ground measurements to create a high-resolution topographic map of the project [2]. - LiDAR technology provides detailed 3D representations of the ground surface, allowing for accurate mapping even in dense vegetation [3]. - This advanced survey method offers more precise data than traditional surveys, ensuring all teams work from the same digital base map [4]. Key Development Objectives - The survey supports several objectives: construction of an automated production plant, expansion of resources for the upcoming drill exploration program, and strengthening environmental and compliance foundations [5]. - The Electrowinning Elution Column Plant will be an automated gold recovery system designed to optimize gold extraction, utilizing the new 3D LiDAR terrain models for site planning [6]. - Accurate land contour and elevation data are critical for efficient site layout design, reducing potential construction delays and future maintenance costs [7]. Construction Efficiency - Detailed spatial information will help accelerate the construction timeline, streamline material delivery, and reduce overall build time, leading to a safer work environment and a solid foundation for long-term operations [8]. Drill Exploration Program - The new area and surface model will be integrated with existing geological and drilling data to better understand mineralized zones in relation to terrain and structural features [9]. - This integration will help identify new high-priority drill targets, reduce uncertainty in resource models, and guide future exploration and engineering work [10]. - Strengthening the geological model will lead to a more precise understanding of gold resources, supporting better economic evaluations and planning decisions [11]. Environmental and Compliance Framework - The survey provides essential data for environmental and safety compliance, establishing baseline data for future monitoring [12]. - The information will aid in developing a comprehensive environmental mapping framework, ensuring responsible resource development and land rehabilitation post-mining [13]. - The CEO emphasized the importance of this survey in preparing for mine development, highlighting its role in engineering design, regulatory compliance, and environmental stewardship [14]. Project Overview - The Sangihe Gold Project is located on the Indonesian island of Sangihe, covering approximately 25,000 hectares, with only 10% explored to date [14]. - The project has an existing National Instrument 43-101 report suitable for mining planning and production schedules for an area targeted for initial production [14].

Stellantis-Baru Gold Completes Area Survey in Preparation of Production Plant Construction & Drill Program - Reportify