Core Points - Wenzhou Port's Leqing Bay area has successfully passed national acceptance, marking a new phase of comprehensive openness for international navigation [1] - The acceptance includes four terminals, with two deep-water berths capable of accommodating vessels up to 100,000 tons [3] - Since receiving temporary open port status in May 2020, the port has welcomed 107 international vessels and handled a foreign trade cargo throughput of 5.199 million tons [3] Group 1 - The construction of a coal terminal at Zhejiang Energy Power Plant includes one 50,000-ton berth and one 70,000-ton berth, with an annual unloading capacity of 14 million tons [3] - As of September 2025, the coal terminal has temporarily accommodated 87 foreign vessels and imported 5.895 million tons of coal [3] - The Wenzhou Maritime Department has played a proactive role in supporting the port's development and ensuring successful national acceptance [5] Group 2 - Key elements such as port facility capabilities and logistics turnover needs have been identified and improved for customs inspection [7] - Collaborative efforts have led to the establishment of an emergency oil spill response equipment depot and the completion of navigation safety assessments [7] - The local government has invested in supporting waterways and anchorages, ensuring readiness for future business needs [7] Group 3 - The implementation of a "container shipping punctuality cost reduction" plan aims to provide 24-hour customs clearance support for shipping enterprises [10] - Digital tools such as smart maritime technology, CCTV, and drones are utilized for vessel tracking and operational safety [12] - The comprehensive opening of Leqing Bay is expected to significantly enhance the overall capacity of Wenzhou Port, contributing to local economic development [12]
新港区口岸开放!乐清湾港区口岸扩大开放通过国家验收
Sou Hu Cai Jing·2025-10-18 05:27