2026雅江水电站高原盛会正在改写能源格局
Sou Hu Cai Jing·2025-10-18 08:01

Core Insights - The construction of the Yarlung Tsangpo River hydropower project faces unprecedented challenges, requiring advanced global technologies to address geological and environmental difficulties [1][5] - The project is expected to transform Tibet into an "energy corridor" connecting mainland China with South Asia, with a 400 kV cross-border power grid planned to achieve a scale of 50 million kW by 2035 [3] - The exhibition serves as a platform for showcasing innovative technologies and fostering collaboration between Chinese and Eurasian companies, highlighting the integration of local operations and technology sharing [5][6] Group 1: Project Challenges and Innovations - The Yarlung Tsangpo hydropower project involves complex construction conditions, including traversing 17 geological fault zones and working in high-temperature environments [1] - The exhibition features seven core areas covering the entire industry chain, including flexible support equipment and special construction materials resistant to seismic activity [1] - Innovations such as the "pressurized TBM" tunneling machine and smart oxygen supply systems have demonstrated significant improvements in construction efficiency [7] Group 2: Market Opportunities and Collaborations - The exhibition is a gateway for Eurasian companies to tap into a billion-level procurement demand and enter the cross-border energy network [3] - The "Eurasian Energy Cooperation Zone" at the exhibition has attracted manufacturers from Russia and Turkey, aiming to leverage the project’s logistics system to access the South Asian market [3] - The event also emphasizes the role of green finance policies from the Hainan Free Trade Zone, facilitating funding for Eurasian companies involved in the project [6]

2026雅江水电站高原盛会正在改写能源格局 - Reportify