Core Points - China Three Gorges Corporation announced that the Three Gorges Reservoir has reached its normal water level of 175 meters, completing the water storage task for 2025 [1] - This marks the 14th time since 2010 that the reservoir has achieved this goal, laying a solid foundation for comprehensive benefits in water supply, irrigation, power generation, navigation, and ecology for the upcoming winter and spring [1] - The reservoir successfully managed water storage and flood control during the storage period, responding to multiple rounds of small to medium floods, including the annual maximum inflow peak flow of 42,500 cubic meters per second [1] Water Management and Coordination - During the 45-day water storage process, the company closely monitored the water situation in the Yangtze River Basin and the upstream reservoir storage plans [1] - Continuous hydrological and meteorological consultations were conducted, enhancing communication and coordination with the Ministry of Water Resources, Yangtze River Commission, power grid companies, shipping departments, and local governments [1] - The company successfully completed the water storage task while ensuring flood defense and post-flood water storage, achieving dual victories [1] Operational Stability - The operation of the Three Gorges Project remained stable during the water storage period, with all monitoring indicators for the dam, power station, navigation buildings, and related facilities being normal [1] - Conditions regarding sediment, geology, and water quality in the reservoir area were reported to be good [1]
第14次实现175米蓄满目标 三峡水库完成2025年度蓄水任务