Workflow
年度进尺突破两万米

Core Insights - The Tarim branch of Shengli Oil Engineering Company has achieved a significant milestone by having its 70751 team become the first team in the company to exceed 20,000 meters in annual drilling depth [1] - The team emphasizes a dual focus on speed and safety, implementing various strategies to enhance production efficiency while maintaining safety standards [2] Group 1: Production Efficiency - The 70751 team has adopted a modular approach to well relocation, introducing advanced tools that have improved relocation speed by 5.2% compared to previous methods [1] - During the relocation of the YQ2-7 well, the team set a record of 7.8 days from relocation to drilling, which is 46% faster than the average relocation time of 13.9 days in the Tar River area [1] - The team has optimized various operational processes, aiming for performance improvement and quality excellence in drilling practices [1] Group 2: Safety Measures - The team adheres to the principle that "safety is the greatest benefit," enhancing safety assessments and incentives while implementing a reward mechanism for reporting hazards [2] - A comprehensive safety production initiative, termed "Thunder Action," is in place to identify and mitigate potential risks in production [2] - The team conducts thorough analyses of neighboring well data before drilling, continuously optimizing technical plans and employing new speed-enhancing tools [2] Group 3: Technical and Training Initiatives - The team has strengthened equipment management and the use of solid control equipment, ensuring comprehensive technical oversight [2] - A combination of training methods, including participation in competitive training and self-directed team training, is utilized to enhance skills and efficiency [2] - Competitions focused on small metrics, such as daily drilling depth and individual challenges, are organized to solidify the talent foundation for drilling speed and efficiency [2]