Workflow
湖北恩施:将国有存量土地纳入“一张图”管理
Zhong Guo Zi Ran Zi Yuan Bao·2025-10-28 04:37

Core Viewpoint - The document outlines a plan by the Enshi Tujia and Miao Autonomous Prefecture in Hubei Province to revitalize state-owned land and mineral resources, aiming for asset management reform through the goals of asset capitalization, securitization, and leveraging state funds [1] Group 1: Objectives and Strategies - The plan emphasizes the need to clarify the status of state-owned enterprises' land and mineral resources, focusing on understanding the baseline, clarifying property rights, and realizing value [1] - Specific measures include conducting natural resource surveys and confirming land rights for state-owned enterprises, establishing a management ledger for land assets, and integrating these into a dynamic management system [1] Group 2: Implementation Measures - The plan encourages the acceleration of the disposal of existing construction land and supports the securitization of land assets, enhancing liquidity and value realization [1] - It promotes the construction of multi-layer industrial buildings that can accommodate various production services, with a requirement that industrial space must constitute at least 50% of the total area [1] - The plan allows for the increase of floor area ratio for legally obtained industrial land without additional land price charges, provided the land use remains unchanged and is aimed at expanding production capacity [1]