Core Points - Beijing Thermal Power is fully preparing for the upcoming winter heating season, prioritizing the operation of heating stations and boiler rooms related to vulnerable groups and previous heating season demands [1][2] - The company manages a vast heating network covering 3.76 billion square meters, serving 2.3 million households with 536 boiler rooms and 5,350 heating stations [2] - A meticulous scheduling system has been implemented, dividing the day into 48 time nodes to match heating output with actual demand based on weather predictions [2][3] Maintenance and Upgrades - Over 40,000 equipment repairs and upgrades were conducted during the summer, including the renovation of 555 kilometers of old heating pipelines [3] - A total of 544 maintenance projects were completed at the Beijing Western Gas Thermal Power Plant to ensure stable supply during peak winter demand [4] - All 19 core units across seven gas power plants have completed maintenance, ensuring optimal operation at the start of the heating season [4] Smart Heating Initiatives - The newly completed Rugus North Heavy Peak Heating Source Plant has a heating capacity of 522 megawatts, covering an area of approximately 13.05 million square meters [5] - The plant features an intelligent monitoring system for real-time parameter tracking and emergency response capabilities [6] - The smart heating initiative has expanded to cover nearly 100 million square meters, with over 20,000 temperature monitoring devices installed to address heating imbalances [6]
全力备战今冬明春供热,与“一老一小”相关热力站锅炉房将优先运行