三方合力推进建设!黄茅峡水库建设座谈会召开

Core Viewpoint - The Huangmaoxia Reservoir construction meeting was held to accelerate the project, which is a significant water conservancy initiative aimed at flood control and comprehensive utilization, including navigation, irrigation, and power generation [2][5][11]. Group 1: Project Overview - The Huangmaoxia Reservoir is located on the Lianjiang River in Qingyuan, with a total storage capacity of 570 million cubic meters and a total investment of 12.388 billion yuan [6]. - The project officially commenced on July 22, 2025, and aims to enhance the flood control system in the middle and lower reaches of the Beijiang River, alleviating flood pressure on cities like Guangzhou and Foshan [7][6]. Group 2: Current Progress - As of now, 19 culvert foundations have been excavated and constructed, with 7.6 kilometers of access roads cleared and 47,000 cubic meters of earthwork completed [8][9]. - The focus is on commencing the main construction work by November [10]. Group 3: Strategic Goals - The project is not only a flood control initiative but also a long-term public welfare project, aiming to be a benchmark for quality and sustainability [11][12]. - The meeting emphasized the need for high standards in project planning and execution, integrating it with broader development initiatives [12][13]. Group 4: Collaborative Efforts - The meeting highlighted the importance of collaboration between the provincial water resources department and the Qingyuan municipal government to address challenges effectively [15][20]. - The project will leverage the strengths of the Yuehai Group in funding, technology, and talent, incorporating advanced management techniques such as digital twin technology [21][22].