Core Viewpoint - The construction of the South Ahmad City infrastructure project in Kuwait focuses on water management, addressing challenges related to groundwater, rainwater, and wastewater treatment [1][2][3]. Group 1: Groundwater Management - The project site has an average of 1-2 meters of groundwater, with seawater intrusion causing significant challenges during construction, including water levels reaching up to 2.5 meters [2]. - Six dewatering solutions were developed to manage groundwater levels, including surface recharge measures to maintain ecological balance and utilize excess water for construction needs [2][3]. Group 2: Rainwater Management - The project incorporates sponge city technology to collect and recycle rainwater, with plans to install approximately 76,009 rainwater collection units and over 264 kilometers of rainwater pipelines [3]. - The rainwater collection system is designed to support irrigation for green spaces, with a capacity to provide enough water for 50 acres of vegetation for a year after a single collection [3]. Group 3: Wastewater Management - The project will provide modern living conditions for at least 100,000 residents, integrating wastewater treatment and reuse into its design [3][4]. - Over 260 kilometers of wastewater pipelines will be installed, with a treatment capacity exceeding 50,000 cubic meters, allowing treated wastewater to be used for irrigation [3][4]. Group 4: Project Scale and Impact - The South Ahmad City infrastructure project covers an area of approximately 52.79 square kilometers and employs over 1,400 workers [4]. - The timely completion of the project is expected to alleviate housing pressure in the old Ahmad area, enhancing the living environment for local residents [4].
中企在科威特新城“治水”